Project Name - CUMNOR HILL STRUCTURAL MAINTENANCE SCHEME
Client - OXFORDSHIRE COUNTY COUNCIL
To stabilise an 80 LM embankment undermined by Badger Setts by structural piling after badger’s had been excluded from the embankment 15m long SX 18 piles with R.C capping beam, traffic management, footpath and road reconstruction.





Project Name - LONGHOLME LAKE BANK WORKS
Client - BEDFORD DESIGN GROUP


Oak timber piling to fishing platforms and viewing platforms.


Project Name - TYLE MILL WEIR REFURBISHMENT
Client - HALCROW GROUP
The construction of a new concrete apron slab with integral walls, concrete walls upstream of existing weir. The rebuilding of projecting ornate abutments. Sheet piling with cladding to the right bank protection upstream of the apron, sheet piling and rip rap bank protection to the left bank downstream of the weir and minor local repairs.





Project Name - COBHAM MILL BANK PROTECTION
Client - ENVIRONMENT AGENCY
Installation of sheet piling along section of riverbank in Cobham, adjacent to grade Il listen building, construction of hardwood timber capping to sheet piling and construction of rock filled gabion bank above the sheet piling to a height of 1.5m.
Cobham Mill is a well-known landmark on the A245 road from Cobham to Stoke d'Abernon which before 1951 was a pair of mills with waterwheels between. The older mill was demolished to enable the road to be straightened. The remaining building dates from 1822 and was in use grinding corn until the 1920s. The Cobham Mill Preservation Trust was set up in 1985 to restore the mill to full working order. It was opened to the public in 1993 and is a listed grade II building.