Project Name |
THE OVAL – HOUSING DEVELOPMENT |
CLIENT |
SOHA HOUSING |
A Housing Development project for SOHA Housing involving the construction of 8 Timber Frame Dwellings with masonry cladding and tiled pitched roofs to include all groundworks, drainage and access roads. A Design & Build project with construction to meet Level 3 Code for Sustainable Homes. Efforts were focussed on a range of Sustainability, Environmental and Health & Wellbeing targets. The site was registered with the Considerate Constructors Scheme achieving a rating of 31 out of 40.
|
Project Name |
HILLSIDE DEVELOPMENT, HOLYPORT, MAIDENHEAD |
CLIENT |
McBAINS COOPER |
Eco Homes comprising the demolition of 21 Garages and the Construction of 6 No, 1 Bedroom 2 Person Flats together with all associated external works, drains, incoming services and all associated external works including car parking for 18 cars.
|
Project Name |
47-49 COWLEY ROAD, OXFORD |
CLIENT |
MR ABDUL KHUJA |
Construction of a new restaurant and comprising of basement, to provide a new toilet, storage area as well as a ground floor kitchen and restaurant area. First floor office accommodation and second floor residential flat are complete with slated pitched roof, copper clad dormers, feature curved copper clad and GRP roofing to veranda areas and built-up felt roofing to rear extension.
|
Project Name |
NEW HOUSE, MORTIMER |
CLIENT |
PRIVATE |
Construction of a high specification 5 bedroom detached house, traditionally constructed comprising cavity walls finished externally in facing brick with plain tied pitched roofs. Complete with the formation of access road, fencing and landscaping works. |
Project Name |
15 MARSTON FERRY ROAD, OXFORD – 22 LUXURY FLATS |
CLIENT |
HOMESPACE LIMITED |
A complete new build which included steel frame, metal decking with concrete composite floors, staircases, brickwork/blockwork and roof works in three storeys. The construction of foundations, underground car parking, basement structure and upper ground floor slab, plus associated below ground drainage and service ducts were carried out by our Civil Engineering Division.
|